Abodu ADU Review (2026): Prices and Is Abodu Still in Business?
By the Renology editorial team · Reviewed by Dror Gigi, Co-Founder · Facts checked
Best for knowing the whole number before you sign
Abodu sells factory-built backyard homes in the Bay Area and Greater Los Angeles with a fixed, itemized, all-in price. As of September 2026 that price runs from $298,800 for a 385 sq ft studio to $498,800 for a 1,195 sq ft three-bedroom, and it covers design, permits, foundation, utilities and installation.
Good to know: Abodu's own site says Bobby Shokri acquired the company in 2025, after reports that summer that the original company had stopped paying some vendors. We found no bankruptcy filing. If you signed before the change, confirm in writing who holds your contract and deposit.
Abodu at a glance
- Price
- All-in from $298,800 (385 sq ft studio) to $498,800 (1,195 sq ft)
- What the price covers
- Design, engineering, permits, sprinklers, delivery, foundation, site work, trenching up to 50 ft, crane up to 100 ft and a project manager
- Price per sq ft
- $417 to $776 (all-in)
- Time to move-in
- About 9 to 12 months including permits; installation in one day
- Serves
- The San Francisco Bay Area and Greater Los Angeles, 90+ cities
- How it is built
- Factory-built modular, to California's state standard for factory-built housing (HCD)
- Warranty
- Ask for terms in writing
- Owner feedback
- Birdeye 4.0 from 81 reviews. Yelp 3.5 from 34. BBB 0 complaints.
- Status
- Operating under new ownership
Abodu models and prices
| Model | Size | Layout | Published price | All-in |
|---|---|---|---|---|
| Studio | 385 sq ft | Studio, 1 bath | $234,800 home + $64,000 install | $298,800 |
| One | 500 sq ft | 1 bed, 1 bath | $260,800 home + $64,000 install | $324,800 |
| Two | 625 sq ft | 2 bed, 1 bath | $293,800 home + $65,000 install | $358,800 |
| Two+ | 800 sq ft | 2 bed, 2 bath | $328,800 home + $96,000 install | $424,800 |
| Three | 1,070 sq ft | 3 bed, 2 bath | $364,800 home + $100,000 install | $464,800 |
| Three+ | 1,195 sq ft | 3 bed, 3 bath | $393,800 home + $105,000 install | $498,800 |
As published by Abodu, checked September 2026.
What the Abodu price includes
The all-in price covers the home, design, civil engineering, permits and plan check, fire sprinklers, delivery, foundation and site work, utility trenching up to 50 feet and the connections, a crane up to 100 feet, and a project manager.
Abodu is the only company we reviewed that publishes, in writing, what sits outside the price: a flat $6,000 boundary survey and lot-marking package, trenching beyond 50 feet, craning beyond 100 feet, demolition or tree removal, unusual site engineering, and sales tax. Walk those two distances in your yard and you will know most of your number before a sales call.
Is Abodu still in business?
Yes. Abodu is operating, and its website and price list are live. Its About page says Bobby Shokri acquired the company in 2025 and now leads it as CEO. The change followed reports in August 2025 that the original company had stopped paying some vendors. We found no bankruptcy filing.
If you signed with Abodu before the change, ask in writing who holds your contract and your deposit. If you are signing now, the usual protection applies: California caps a home-improvement down payment at $1,000 or 10% of the contract, whichever is less.
How long it takes
Abodu's process page describes about 9 to 12 months including permits. Setting the home on its foundation takes one day.
Abodu reviews: what owners say
Birdeye shows 4.0 from 81 reviews, Yelp 3.5 from 34 and Trustpilot 3.2 from 9, with BBB showing no complaints. The recurring complaint is timing, so put dates and remedies in the contract.
What we like, and what is worth knowing
What we like
- The most complete, itemized all-in pricing in California
- A written list of exactly what is quoted separately
- Pre-approved plans in San Jose and Sonoma County
- A one-day installation
Worth knowing
- Higher per square foot than most, especially on small models
- Some owners report delays, so agree dates in the contract
Choose Abodu if
- You want the full price, with exclusions, before you commit
- You are in the Bay Area or Greater Los Angeles
- A pre-approved San Jose or Sonoma plan would help your permit
Look elsewhere if
- Budget is the main constraint (Boxabl, USModular or Perpetual Homes)
- You want a highly custom design (Cover or Plant Prefab)
How Abodu scores
7.8 out of 10 on our published method. Every listed company starts at 7.0. Information a company does not publish counts as neutral.
- Total installed costStandard
- Price transparencyStandout
- Time to move-inGood
- Build methodGood
- WarrantyStandard
- Owner feedbackStandard
- Company stabilityStandard
- California coverageGood
- Design choiceStandard
The part most prefab prices leave out
Get your site work checked by a local contractor
Foundation, trenching, utility connections and crane access decide most of the gap between a sticker price and a finished ADU. A licensed local contractor can walk your yard and price that part before you sign with a factory.
Find a vetted ADU contractorAbodu FAQ
How much does an Abodu cost?
Abodu publishes all-in prices from $298,800 for the 385 sq ft Studio to $498,800 for the 1,195 sq ft Three+, as of September 2026. That includes design, permits, foundation, utilities up to 50 feet and installation.
Is Abodu still in business?
Yes. Abodu is operating under new ownership: its site says Bobby Shokri acquired the company in 2025, after reports that summer of unpaid vendors. We found no bankruptcy filing.
What is not included in the Abodu price?
A $6,000 boundary survey and staking package, trenching beyond 50 feet, craning beyond 100 feet, demolition or tree removal, unusual site engineering and sales tax.
Is Abodu bankrupt?
We found no bankruptcy filing. Reports in August 2025 said the original company had stopped paying some vendors, and Abodu's own site says Bobby Shokri acquired the company in 2025. It is operating and selling today.
How long does an Abodu take?
About 9 to 12 months including permits, per Abodu. Installation takes one day.
Other prefab ADU reviews
- Perpetual Homes ADU Review (2026): Prices, Models and Warranty
- Samara ADU Review (2026): Samara Backyard Prices and Timeline
- Villa Homes ADU Review (2026): Prices, Timeline, What Changed
- Boxabl Casita Price and Reviews (2026): Turnkey Cost in California
- USModular ADU Review (2026): Prices, Timeline and License
- Cover ADU Review (2026): Cost, Timeline and Fire-Resistant Steel
- Dvele ADU Review (2026): Modular Home Cost and What It Includes
- Studio Shed ADU Review (2026): StudioHOME Prices and Installation
- Azure Printed Homes Review (2026): 3D-Printed ADU Cost
- Plant Prefab Review (2026): LivingHome ADU Cost and Timeline
- LiveLarge ADU Review (2026): Prices, Warranty and Timeline
Sources: Abodu: pricing · Abodu: fixed pricing and exclusions · Abodu: about (ownership) · August 2025 vendor report (LinkedIn) · Abodu: process · San Jose pre-approved Abodu plans