Home Remodeling in Redmond

City planning guide · Local planning for Redmond. Confirm the jurisdiction serving your address.

Contractor availability depends on your address, project and timing.

More than a quarter of Redmond's homes were built in 2010 or later, and the median house dates from 1993. Old wiring is rarely the problem here; the ground is. City wells draw 40 percent of Redmond's drinking water from the aquifer under town, and since mid-2025 that has limited how much groundwater a construction crew may pump out of a hole.

Find a contractor in Redmond →
A 1990s two-story house in Redmond, Washington after a renovation

What changes a remodel in Redmond.

27 percent of Redmond homes were built in 2010 or later

Of the 35,104 housing units the Census Bureau counted in Redmond for 2020 to 2024, 9,473 of them went up in 2010 or later. The median home was built in 1993, and just 574 date from before 1940. Houses that young postdate the 1978 federal ban on lead paint in homes, so the usual old-house line items shrink, and budgets go further on layout, finishes and systems.

Source: Census ACS 2020-2024, Year Structure Built, Redmond

Groundwater supplies 40 percent of Redmond's drinking water

Redmond protects its municipal wells with two Critical Aquifer Recharge Areas. CARA I covers ground where water takes up to five years to reach a city well, which the city calls the most vulnerable to pollution; CARA II covers the 10 year zone. After 13 years of study, the City Council restricted temporary construction dewatering, meaning pumping groundwater out of an excavation, to utilities, elevator pits and footings inside the recharge area, effective June 28, 2025. A deep basement dig here gets checked against that rule early.

Source: City of Redmond, Groundwater and Wellhead Protection

Redmond requires a permit for any tree 6 inches across

The city's January 2025 tip sheet says removing any significant tree, meaning a trunk at least 6 inches thick measured 4.5 feet off the ground, needs a Tree Removal Permit. Developed lots up to 10,000 square feet may remove up to two a year, lots up to 20,000 square feet four, lots up to 30,000 six and larger lots eight. Landmark trees, over 30 inches, need a Tree Exception Request and an arborist report, and each one removed is replaced with three new trees. Trees in wetlands, stream buffers and landslide areas stay unless an arborist finds them hazardous.

Source: City of Redmond, Tree Removal Tip Sheet, January 2025

What a remodel costs in Redmond in 2026.

$2,544.02

Building permit fee on a $150,000 remodelRedmond 2026 table: $1,984.02 for the first $100,000 plus $11.20 per added $1,000; plan review, a 4% technology surcharge and $6.50 state fee come on top

Redmond sets its building permit fee from the declared value of the work, materials and labor together, and the 2026 table makes the math easy to run. A remodel valued at $150,000 carries a building permit fee of $2,544.02. Plan review adds 65 percent of that, a 4 percent technology surcharge applies to the total, and the state adds $6.50. Planning review has flat fees of its own, $105.04 for a deck and $324.01 for a residential addition. Those fees sit against a median owner-occupied home value of $1,167,800.

System upgrades such as a heat pump or new ducting are priced by a trade that is paid well above the national median here. Heating and air conditioning mechanics in the Seattle metro earned a median of $38.51 an hour in May 2025, while the national median was $29.33, and that gap shows up in quotes for system upgrades.

The numbers behind this section
Building permit fee on a $150,000 remodel$2,544.02Redmond 2026 table: $1,984.02 for the first $100,000 plus $11.20 per added $1,000; plan review, a 4% technology surcharge and $6.50 state fee come on top (City of Redmond, Residential Building Permit Fees effective February 1, 2026)
Planning review fee for a deck$105.04Flat 2026 planning fee; a residential addition is $324.01 (City of Redmond, Residential Building Permit Fees effective February 1, 2026)
Median home value$1,167,800Owner-occupied homes in Redmond, Census ACS 2020-2024 (Census ACS 2020-2024, Median Value, Redmond)
Homes built in 2010 or later27.0%Share of Redmond's 35,104 homes built since 2010, per the 2020-2024 ACS; half predate 1993 (Census ACS 2020-2024, Year Structure Built, Redmond)
Median HVAC mechanic wage$38.51 an hourHeating, air conditioning and refrigeration mechanics around Seattle, May 2025; nationwide the median was $29.33 (BLS OEWS May 2025, Seattle-Tacoma-Bellevue HVAC mechanics and installers)

Who issues permits in Redmond.

Redmond is not on the shared MyBuildingPermit.com portal. Residential permits come from the city's Development Services Center at 15670 NE 85th Street, and most applications start with the Plan Review Online request form, after which documents are uploaded to the Redmond ePermitting Service, called REPS. Walk-in applications are taken first come, first served. Electrical, mechanical, plumbing and fire permits are issued separately from the building permit.

  • Redmond exempts one-story detached accessory buildings up to 200 square feet, fences as tall as 7 feet, and retaining walls no taller than 4 feet from footing to top unless they carry extra load.
  • A deck needs no permit if it covers 200 square feet or less, sits no more than 30 inches above grade at any point, is not attached to the house and does not serve the required exit door.
  • Lightweight roof coverings, such as composition or metal roofing under 4 pounds per square foot installed, are exempt from a building permit.
  • Replacing exterior windows in existing openings needs no permit as long as the opening size stays the same and the operable opening is not made smaller.
  • Painting, wallpaper, tile, carpet, cabinets and countertops are finish work and need no permit.
  • ADUs are allowed in all of Redmond's residential zones, attached or detached, and the city's handout limits most to 1,500 square feet. New detached ADUs, like new homes, must have fire sprinklers.
  • Removing 11 or more significant trees triggers a clear and grade permit from Development Engineering on top of the tree permit.

What Redmond homeowners plan most.

Landscaping and tree removal

Every significant tree 6 inches or thicker needs a permit in Redmond, and a lot under 10,000 square feet may remove two a year.

Bathroom remodel

Tile, cabinets and countertops need no permit here, but plumbing and electrical work carry their own separate permits. The bathroom guide was written for Seattle; Redmond's Development Services Center issues the permits.

Read our Seattle bathroom remodel guide

Kitchen remodel

In a house built after 1993, a kitchen job is often a layout and finish project; the building permit fee follows the declared value. We link a Seattle kitchen guide; in Redmond the permit comes from the city.

Read our Seattle kitchen remodel guide

Roofing

Composition and metal roofing under 4 pounds per square foot is exempt from a building permit in Redmond. We link a roofing guide written for Seattle, whose wet winters Redmond shares; the city here issues any permit.

Read our Seattle roofing guide

Basement finishing

Finishing an existing basement is interior work, but digging a new one in the aquifer recharge area runs into the 2025 dewatering limits. The basement guide was written for Seattle; Redmond reviews any excavation.

Read our Seattle basement finishing guide

ADU or garage conversion

ADUs are allowed in every Redmond residential zone, and a new detached unit needs fire sprinklers. We link a Seattle ADU guide; Redmond handles the permit.

Read our Seattle adu or garage conversion guide

Before you start.

How much are building permit fees for a remodel in Redmond?

Redmond's 2026 table charges $1,984.02 for the first $100,000 of declared value plus $11.20 for each additional $1,000, so a $150,000 remodel pays $2,544.02. Plan review adds 65 percent of that fee, a 4 percent technology surcharge applies, and the state charges $6.50. Electrical, mechanical and plumbing permits are billed separately.

Does Redmond use MyBuildingPermit?

No. Redmond runs its own system. Most residential permits start with the Plan Review Online request form, and a permit technician then sends instructions to upload plans to the Redmond ePermitting Service, or REPS. You can also apply in person at the Development Services Center at 15670 NE 85th Street, first come, first served.

Do I need a permit to remove a tree in Redmond?

Yes, for every significant tree, which Redmond defines as 6 inches or wider at 4.5 feet. Developed lots up to 10,000 square feet may remove up to two a year, rising to eight on lots over 30,000 square feet. Landmark trees over 30 inches need a Tree Exception Request with an arborist report and three replacement trees.

Can I build a basement in Redmond?

You can, but check the groundwater rules first. Redmond draws 40 percent of its drinking water from wells, and since June 28, 2025 temporary construction dewatering inside the Critical Aquifer Recharge Area is limited to utilities, elevator pits and footings. If a new basement would need groundwater pumped out during construction, raise it with the city before design.

Do I need a permit to replace windows or a roof in Redmond?

Usually not. Replacing windows in existing openings is exempt if the opening stays the same size and the operable part does not shrink. Composition, metal or similar roofing weighing under 4 pounds per square foot is also exempt. New openings, heavier roofing or structural changes need a building permit from the city.

Explore regions, cities & neighborhoods →

Renovating in Redmond?

Tell us what you are planning. A Renology advisor talks it through and introduces a vetted contractor who works in Redmond. Free, with no obligation.

Find a contractor in Redmond →

Already have a bid? The quote-review tool checks its scope and exclusions, wherever you live.